Blog – Full Width

by

Minister Admir Šahmanović formally assumes energy, mining portfolio in Montenegro

Prime Minister of Milojko Spajić has merged two ministries, so Minister of Mining, Oil and Gas and Coordinator of the Ministry of Energy Admir Šahmanović took the helm at the joint energy and mining portfolio. Among his primary responsibilities are the completion of the domestic part of the Trans-Balkan Electricity Corridor, the installation of the second line of the Monita submarine interconnector with Italy and power market coupling with the European Union.

The Parliament of Montenegro elected Minister of Energy and Mining Admir Šahmanović. He led the Ministry of Mining, Oil and Gas in  since July. As Minister of Energy Saša Mujović was elected mayor of the capital Podgorica, Šahmanović recently took over as coordinator,

Prime Minister Milojko Spajić now formally merged the two ministries again. “If we complete the Trans-Balkan Corridor – only a few kilometers are left, the second line of the underwater cable toward Italy, Montenegro is becoming the cooperation bridge between the Balkans and the EU,” he said in the national assembly, promoting Šahmanović.

The list of priority energy infrastructure, adopted in December, also includes the Komarnica and Kruševo hydropower projects, the Ionian-Adriatic Pipeline (IAP), a subsidy scheme for rooftop solar power plants, energy efficiency measures and a floating solar power unit.

The Trans-Balkans Electricity Corridor is a project for upgrading transmission systems in Serbia, Bosnia and Herzegovina and Montenegro. The proposed lines run from Romania to the Monita subsea interconnector with Italy.

Admir Šahmanović will participate in the first panel discussion within Belgrade Energy Forum (BEF 2025), organized by Balkan Green Energy News. The two-day conference in Serbia, starting on May 14, is the central meeting point for representatives of regional and international institutions, organizations and the business community from the region, Europe, and beyond.

Minister has master’s degree in financial management

The minister said earlier this month that current photovoltaic and wind power projects would boost Montenegro’s electricity capacity fivefold, to 5 GW. Admir Šahmanović, born in 1985, has a master’s degree in financial management. He is in the leadership of the Bosniak Party.

Early in his career, he worked in PricewaterhouseCoopers in both Montenegro in Serbia, in Montenegro’s ministries of sustainable development and tourism and public administration, and the British Council in Podgorica. The current minister has experience in managing funds received from the European Union.

Šahmanović entered energy policy sphere in 2022

Three years ago, Šahmanović was named state secretary in the Ministry of Capital Investments, which included the energy portfolio. He participated in the negotiations on the EU accession and on obtaining loans from international financial institutions.

According to his official biography, the minister has promoted sustainable energy and transportation and environmental protection and worked on the country’s strategic documents and action plans.

Additionally, Šahmanović has managed EU-funded projects for wastewater purification and green energy.

Last month he oversaw the adoption of the new Law on Energy.

by

Nofar Energy inks deal for 265 MW solar power plant near Bucharest

The operator of the biggest solar power plant in Romania is about to start building a much bigger facility. Nofar Energy signed a turnkey contract including operation and management for a 265 MW system in Corbii Mari in Dâmboviţa County.

Just west of Bucharest, one of the largest photovoltaic projects in Romania is nearing materialization. A consortium of COX Energy from Spain and domestic firm AJ Construction, part of AJ Brand, is the designated contractor and operator for a proposed 265 MW solar power plant in Corbii Mari. A multijurisdictional team of Clifford Chance lawyers, coordinated by its Bucharest office, advised Nofar Energy, the developer, and revealed the news.

The small commune is in Dâmboviţa county. The Israeli company acquired the project in late 2023.

The Clifford Chance Badea law office said the Corbii Mari endeavor is the fourth engineering, procurement and construction (EPC) and operation and maintenance (O&M) contract in which it assists Nofar Energy. The overall collaboration concerns renewable energy projects in Romania for over 650 MW, it added.

Nofar recently said is meeting the timelines for its key projects in the country including Ghimpați (146 MW) and Iepurești (169 MW) and Slobozia, of 74 MW. The last of the three won government support through a contract for difference (CfD) at the country’s first auction. The Israeli company added that it has a project portfolio of 970 MW and 120 MWh. The latter item apparently concerns battery storage.

In addition, Nofar Energy said last month that it connected to the electricity grid its solar park in Ada, the largest such system in neighboring Serbia.

by

OMV Petrom, CE Oltenia pick contractors for four solar power plants

Oil and gas company OMV Petrom and coal power utility Complexul Energetic Oltenia (CE Oltenia) have signed design and installation contracts for four solar power plants.

In October 2022, OMV Petrom and Complexul Energetic Oltenia said they would build four photovoltaic parks with a combined capacity of 450 MW at former coal mining locations using European Union funds. The two companies are equal partners in the joint venture, each holding a 50% stake.

Now OMV Petrom announced that the four projects would have a total installed capacity of approximately 550 MW, higher than initially planned.

The capacity increase is a result of innovative solutions maximizing power production capability

The increase is a result of innovative solutions that the contractors proposed, to maximize the power production capability, according to the company.

The design and execution of three of the four photovoltaic parksRovinari, Tismana 1, and Tismana 2with a combined capacity of around 460 MW, was awarded to a consortium formed by US-based Ameresco and Sunel, reads the press release. The latter is registered in the United Kingdom, but its operational headquarters are in Athens, Greece. 

The consortium is already active in the region, and recently it launched construction of a giant solar power plant in Greece.

Girisim Elektrik installed the  largest solar power plant in Serbia

Turkish company Girişim Elektrik is in charge of the fourth photovoltaic park, with a capacity of around 90 MW. The site is at the former CE Ișalnița power plant, on its slag deposit.

The latest project in the surrounding region that was completed by the contractor is thelargest solar power plant in Serbia. Girişim also installed one of the first utility-scale solar power plants in the Western Balkans – the 10 MW Oslomej unit in North Macedonia.

Of note, tenders for contractorsattracted investors from China, Turkey, the United States, Germany, and Ukraine.

EUR 400 million investment

OMV Petrom estimates the total investment for the four solar projects at over EUR 400 million, of which approximately 70% is financed through the European Union’s Modernisation Fund.

According to Frank Neel, member of the company’s executive board responsible for gas and power, the new contracts are a firm step in strengthening its position in the renewable power sector.

“Through our Strategy 2030, we aim to be a key player in Romania’s energy transition, with the ambitious target of developing 2.5 GW of capacity, including partnerships, from renewable sources – wind and solar,” he added.

The projects will be built on land owned by CE Oltenia, in the Gorj and Dolj counties.

The generated electricity would be delivered to the national power grid and it is expected to cover the annual electricity consumption equivalent of approximately 410,000 households in Romania, OMV Petrom said.

by

Case of Struga illegal landfill in North Macedonia goes to Strasbourg court

The Macedonian Young Lawyers Association (MYLA or MZMP) from Skopje said the only hope for justice regarding the issue of the illegal landfill near Struga is now outside North Macedonia. Namely, judicial authorities have declared themselves incompetent for the nongovernmental organization’s 2021 lawsuit against local and state institutions. The landfill is jeopardizing a basic human right – to a healthy environment, the young lawyers pointed out.

North Macedonian environmental and civic activists have been trying to prove in court for years that the illegal landfill at the entrance of the town of Struga is poisoning people. It is the second-largest tourist center in the country, located on the shores of Lake Ohrid. Their struggle, which began in January 2021, has not yielded results.

The Macedonian Young Lawyers Association is suing the Municipality of Struga, the Public Utility Company of Struga, and the Ministry of Environment and Spatial Planning, claiming they have done nothing to solve the serious issue. They demanded that the court bans further waste dumping and that the area be cleaned and revitalized. But instead, thousands of tons of various waste are piling up at the landfill every year, polluting the environment, air, and agricultural land, thus negatively affecting the health of citizens.

Both the Basic Court in Struga and the Appellate Court in nearby Bitola declared that the courts in the country do not have the authority to rule on the issue. It is the first such lawsuit in the country.

Courts protect government even amid human rights violations

Now the landfill issue is moving to the Court of Human Rights in Strasbourg, after a failed attempt to prove that the landfill threatens a fundamental human right, to a healthy environment, but also the right to life, as the institutions did not take measures to prevent or reduce harmful consequences.

„I have an impression that Macedonian courts have a hard time getting out of this matrix, constantly protecting state and public authorities, even when we have a situation of violation of fundamental human rights and the constitutionally guaranteed right to a healthy environment,” Gligorie Kjatoski, from the civil initiative Enough is Enough, told Balkan Green Energy News. He is involved in the dispute as a lawyer.

The two courts in North Macedonia referred to the fact that there is not a single judgment yet against the government that they could apply

„If Strasbourg establishes a violation of one of the fundamental human rights, then that will be the basis for our request to repeat the procedure before the Macedonian courts,” Kjatoski said.

According to him, there are already examples when the European Court of Human Rights acknowledged its jurisdiction for similar cases.

„The practice in Strasbourg is very clear. That no one is responsible for an illegal landfill and enormous environmental pollution is not an option. During the procedure, we submitted several judgments to the European Court of Human Rights, where a violation was established in similar situations. The Appellate Court in Bitola and the court in Struga did not take into account the practice of the European Court, claiming there were no judgments against the Republic of Macedonia that could be directly applied. But I do not know how much that argument holds up,” Kjatoski added.

One 2022 judgment of Higher Court in Serbia is example of protection from illegal landfills

In neighboring Serbia, there are cases where the courts have ruled in favor of the citizens.

„The practice of the European Court of Human Rights is that resolving issues such as this one with the Struga landfill falls within the jurisdiction of regular courts. Unlike the domestic courts, which claim that civil courts do not have the jurisdiction to play a proactive role in protecting human rights in the context of protecting the environment from illegal landfills, courts in the region do rule in favor of citizens, Kjatoski stated. He pointed to a decision by the Higher Court in Belgrade in neighboring Serbia, from September 22, 2022.

Mayor of Struga Ramiz Merko from the Democratic Union for Integration, one of the parties representing the Albanian community in the country, has promised that the problem would be solved and the landfill moved to another location. The United States Department of State blacklisted him almost two years ago.

There are 54 illegal landfills in the Republic of North Macedonia

The Struga site is than 2,000 meters from Lake Ohrid, in a fertile agricultural plain. It covers an area the size of four football fields. According to estimates, more than 40,000 tons of waste are disposed of there annually.

The landfill was established in 2006, as a temporary solution. It is more than 18 meters high and about 10 meters deep.

It is located five hundred meters from the first houses in the city of Struga and the same distance from the Black Drim river. The United Nations Educational, Scientific and Cultural Organization (UNESCO) declared the area a world natural and cultural heritage.

According to data from the Ministry of Environment and Spatial Planning, there are 54 non-standard, illegal landfills in North Macedonia. The only one that meets such conditions is the Drisla near the capital Skopje.

The only solution to the problem is seen in the closure of local and construction of regional landfills, which public officials have been promising for years. But they cannot be built due to resistance from people residing around the proposed locations.

For the waste from Struga and several other settlements in the southwest and the Pelagonia area, there are plans to build a regional landfill in the small municipality of Novaci near Bitola.

by

Serbian Minister of Mining and Energy Dubravka Đedović Handanović gets third mandate; Sara Pavkov takes over environment

The National Assembly of Serbia reelected Minister of Mining and Energy Dubravka Đedović Handanović for her third term. The youngest member of the new cabinet, led by Prime Minister Đuro Macut, is the new Minister of Environmental Protection – Sara Pavkov.

Members of parliament voted in the new Government of Serbia today with 153 in favor and 46 against the proposal, while 51 lawmakers were absent from the session. The lineup under Prime Minister Đuro Macut, who has just entered the political arena now, includes Sara Pavkov, responsible for environmental protection. At 33, she is the youngest member of the cabinet.

Minister of Mining and Energy Dubravka Đedović Handanović was elected for her third mandate.

At 33 years old, Sara Pavkov is the youngest minister in the team of new Prime Minister Đuro Macut

Pavkov holds a graduate and master’s degree from the biology and ecology department of the University of Novi Sad Faculty of Sciences (FTN). She is a doctoral candidate and research intern at the faculty, according to her official biography.

Since 2022, she has served as a state secretary at the Ministry of Environmental Protection. Before that, she was the chief of staff since June 2021, after holding the position of special advisor for environmental protection from November 2020.

As one of the vice-presidents of the Bureau of the United Nations Framework Convention on Climate Change (UNFCCC), Sara Pavkov participated in the UN Climate Change Conference COP26 in Glasgow in 2021.

From 2013 to 2020, she coordinated more than 20 civil society projects for environmental protection. The new minister has authored or coauthored 11 scientific and professional papers in the same field.

She joined the ruling Serbian Progressive Party (SNS) since 2012. Since November 2021, Sara Pavkov has been a member of its presidency.

Third run for Dubravka Đedović Handanović as minister of mining and energy

Dubravka Đedović Handanović was first elected minister of environment and energy in October 2022 in the cabinet of Prime Minister Ana Brnabić. She was reappointed last May, when Miloš Vučević became the prime minister of Serbia.

Before becoming minister, she was a member of the Executive Board of NLB Komercijalna banka, responsible for corporate and investment banking. She has an international experience in banking of more than 16 years.

Minister Đedović Handanović, who remained in position in the new government, has worked in the EIB

Đedović Handanović has graduated in banking and finance from the Faculty of Economics in Belgrade and obtained her master’s degree in finance and management from SDA Bocconi University in Milan and the Anderson School of Management at the University of California in Los Angeles (UCLA).

She headed the Regional Office of the European Investment Bank (EIB) for the Western Balkans from 2016 to 2021, before moving to NLB Komercijalna banka.

Until the start of her tenure in Belgrade, Dubravka Đedović Handanović was the manager for Albania, North Macedonia and Serbia at the headquarters of the EIB in Luxembourg. It is the European Union’s main lending institution. She was also in charge of public-private partnership projects and project financing in countries including Ireland, France, the United Kingdom and the Benelux.

Before starting her career in banking, the reelected minister of mining and energy worked in the media and communications sector.

by

Energy Advisory Center established in Knjaževac in Serbia for citizens, firms

Knjaževac in Serbia got an Energy Advisory Center, intended for all citizens and small entrepreneurs who want to save energy, reduce costs, and improve their living and working conditions, as well as for those considering or already implementing energy efficiency measures.

The opening of the Energy Advisory Center in Knjaževac, a town in eastern Serbia, was marked by holding a roundtable discussion with local partners. At the event, the representatives of institutions, public companies, organizations, and the business sector were invited to join the facility’s mission and contribute to the dissemination of knowledge within their respective fields.

“Energy efficiency needs to become a higher priority for everyone. That’s why we need an Energy Advisory Center that communicates with all members of the local community, and not just subsidy beneficiaries,” said Daniela Kostadinova, senior advisor in the project Promotion of Renewable Energy Sources and Energy Efficiency in Serbia, implemented by GIZ.

She added that investing in expanding the scope of the center – which provides not only financial but also advisory support – contributes to an improved quality of life for a greater number of citizens and to a better understanding of their needs.

The Energy Advisory Center in Knjaževac will offer free advice to all interested citizens and entrepreneurs on energy efficiency and investment opportunities in renewable energy sources. Visitors will also be able to get information on subsidies and other financing options for such investments and learn from examples of good practice.

“The opening of the Energy Advisory Center represents an important step toward improving the quality of life of our fellow citizens. By providing relevant information and advice, we are enabling both citizens and businesses to use energy more efficiently, reduce their costs, or even generate new income,” said Milan Đokić, Mayor of Knjaževac.

The center will be operated by the municipality’s enterprise for development, urban development and construction. It is located in its premises, too. The public firm’s director Mladen Radosavljević stated at the opening that the center would be open for one-on-one consultations, group discussions on various topics, and for providing all necessary advice related to energy efficiency.

The establishment of the Energy Advisory Center in Knjaževac was supported by the German Federal Ministry for Economic Cooperation and Development (BMZ), in cooperation with the Regional Development Agency of Eastern Serbia (RARIS). The project was implemented by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.