
Bulgarian coal plant mulls replacing boiler with molten salt battery
The operator of the AES Maritsa iztok 1 coal plant in Bulgaria is interested in replacing one of its boilers with a molten salt reactor. It would accumulate excess renewable energy from the power grid as heat and produce steam to drive the existing turbine. With the surge in solar and wind power capacity throughout […]