
TAP receives around 95% of total pipes needed for construction
By Leman Zeynalova: Approximately 95 percent of the total 55,000 pipes to be used for the construction of the Trans Adriatic Pipeline (TAP) have been received in Greece, Albania and Italy, said the message from TAP AG. The last shipment of offshore line pipes has been offloaded in Brindisi, Italy, between 3 and 6 September […]